Beginning the week of June 13, Goodwin is overseeing the
reconstruction of a portion of Ensign Street at Riverside Drive. The road will
be closed for approximately two weeks. Detour signs will direct traffic through
King Court to Willow Street to access Riverside Drive. Total construction
period will be six to eight weeks. For those coming from Main Street, turning
directly onto Willow Street is probably a preferred alternative route. Although
this will be a temporary inconvenience, the new roadway and sidewalks, improved
lighting, and emergency blue light towers on either side of the highway will
benefit everyone. If you have questions or concerns, please contact Rich
Vibberts at rvibberts@goodwin.edu or
860-913-2023.